Infovista | 5G network drive testing using electric vehicles

Use case 4: Multi-brand charging hub testing This scenario demonstrates testing considerations for a large-scale charging facility:

Theoretical facility profile: • Location type: Urban charging hub • Charging points: Multiple brands and charging speeds • Testing scope: Network capacity and user experience • Duration: Long-term performance monitoring Typical daily patterns: • Average daily charging sessions: 140-150 • Peak concurrent sessions: 15-20 • Network usage distribution: • Video streaming platforms: ~45% of traffic • Web browsing: ~25% of traffic • Video conferencing: ~15% of traffic • Gaming services: ~10% of traffic • Miscellaneous applications: ~5% of traffic

Testing requirements: • Multi-carrier testing capability • Extended duration monitoring • User experience simulation • Capacity stress testing

Operational considerations: • Need for 24/7 monitoring capability

• Equipment placement for optimal coverage • Power management for testing equipment • Data collection and analysis methods

Points of attention: • Importance of testing during various times of day • Need for multiple testing devices to simulate concurrent users • Value of automated testing sequences • Requirement for comprehensive data analysis

These use cases highlight the complexity of testing requirements. They demonstrate how testing teams must consider not only technical requirements but also usage patterns and user behavior when planning their testing approaches.

10

Powered by